White paper · JBF Consulting × Opsi Systems · 2026

Beyond the Limits of Traditional Optimization

How GPU acceleration is transforming supply chain planning. Independent benchmarks of Chora, Tramm's GPU-powered route optimization engine, against its CPU predecessor and two leading commercial solvers.

By Chris Doersen (JBF Consulting) and Dan Palay (Opsi Systems) · 20 pages · ~15 min read
Illustration of a GPU chip at the centre of a circuit board, the cover art of the Chora white paper
Key findings
90%
faster solve time: 417 jobs planned in 1 minute versus 10 minutes for the CPU-based Solo solver.
99.1%
faster than a leading commercial solver on an 845-job, four-region, fatigue-constrained problem (1 minute vs. ~2 hours).
−7.4%
distance and one fewer vehicle on a single-day plan with time windows and capacity constraints.
416/417
jobs planned under EU driver-fatigue rules, where the CPU solver managed 196 in 60 minutes.

Executive summary

In short: Chora, the GPU-powered optimization engine inside Tramm TMS, was benchmarked against Tramm's original CPU-based solver (Solo) across four scenarios and against two leading commercial routing solvers on a real U.S. manufacturer's network. In every test Chora solved in about one minute, versus 10 minutes to 2 hours for CPU solvers, and produced equal or better plans: fewer vehicles, shorter distances, more jobs planned, and full compliance with driver-fatigue and loading-bay constraints.

Traditional CPU-based solvers have for a long time been the biggest bottleneck in optimizing supply chain and distribution networks. As global logistics operations are growing in complexity, the limitation of this approach has only gotten worse. In addition, traditional CPU-based solvers not only take long to solve, but they are also reaching limits as routing, scheduling, and compliance constraints become more critical to generating executable results and saving costs.

Chora, a GPU-powered optimization engine developed by Opsi Systems that is used in its TMS platform Tramm, represents a fundamental leap forward, delivering faster, more scalable, and higher-quality route optimization. This paper, co-authored with JBF Consulting, presents validated performance findings from both a comparative study between Tramm's original solver and results from two well-respected commercial routing and scheduling tools.

In this paper we describe how traditional methods have reached a plateau in performance, while the burgeoning AI technology infrastructure has opened a new world of possibilities that were unavailable only a few years ago and that Chora can now leverage to profound effect.

Foreword

Assumptions and truisms are prevalent in many aspects of the transportation industry, though one that rarely generates a discussion is the traditional idea of using Central Processing Units (CPUs) to solve routing problems. For decades it has been a given that more power and faster processors would speed up optimization and generate a better result. But this path reached its diminishing returns far longer ago than most of us have realized.

It has taken an entirely new, and in hindsight exceedingly logical, idea of shifting away from CPUs and using the latest breakthrough in Graphics Processing Units (GPUs) to transform our approach to transportation algorithms. The results are, and we state this without exaggeration, a massive leap forward in processing times and quality of results.

We are only scratching the surface of what these optimization speeds can unlock. This will go well beyond what can be improved in a single fleet routing cycle, ultimately impacting the entire tactical process of daily and weekly routing, before then transforming what can be accomplished with strategic supply chain network optimization.

The industry challenge

As supply chains expand, transportation planners face more complex optimization problems: multi-day horizons, time windows, dock scheduling, fatigue rules, dynamic capacity constraints, traffic, and more. Existing solvers built on traditional CPU architectures struggle to maintain both speed and solution quality at the scale demanded by modern supply chains. These systems, designed decades ago, are ill-equipped for the parallelized, data-intensive needs of today's logistics routing problems.

Why traditional solvers plateau

Even leading optimization engines, like those underpinning current market-leading transportation management platforms, depend primarily on CPU-based architecture. As problem size and constraint diversity grow, computation time scales exponentially. In real-world conditions, this leads to long solve times, suboptimal fleet utilization, and reduced agility.

Chora's predecessor, Solo (built on Google OR-Tools), has been used successfully with numerous customers and is already considered to be a strong solver by industry standards. Despite that success, Solo is still limited by its CPU-based optimization approach, motivating a full architectural redesign by Opsi Systems based on the theoretical improvements using GPUs as the primary optimization tool.

The Chora architecture

Chora is a GPU-powered vehicle routing solver engineered to address large-scale problems involving complex constraints. Built using NVIDIA's CUDA framework, it leverages thousands of GPU threads and advanced genetic algorithms to explore solution spaces faster and more thoroughly than CPU solvers. This GPU-first approach enables Chora to deliver high-quality solutions in seconds, solving problems that previously took minutes or hours.

Chora's success heralds a structural change in how optimization can be performed. GPU-based computing scales linearly with problem size, offering consistent performance even in highly complex, multi-constraint environments. This technology empowers planners to re-optimize in near real-time, improving fleet utilization, reducing costs and emissions, and enabling dynamic responsiveness to operational variability.

Opsi Systems internal study: Tramm's original solver (Solo) versus Chora

Opsi Systems conducted a study benchmarking Chora against Tramm's original solver, Solo. Four of the study scenarios are outlined below. All scenarios used the same data set:

1
Depot
34
Vehicles
417
Jobs and sites

Scenario 1: Single-day planning with time windows and capacity constraints

The first scenario was a simple case that looked at single-day planning with time windows and capacity constraints. All of the 417 jobs were planned by both Solo and Chora. Solo planned them all in 10 minutes while Chora managed to plan them all in 1 minute. Chora also showed significant improvements in trip duration, distance travelled, vehicles used, and cost:

Scenario 1 results: Solo vs. Chora, 417 jobs, 34 vehicles available
SolverRuntimeJobs plannedTotal trip durationTotal trip distanceVehicles usedTotal cost
Solo10 min417/417430 hr 38 min7,137 km27/34$77,385.70
Chora1 min −90%417/417 0%405 hr 48 min −6.1%6,606 km −7.4%26/34 −3.7%$74,586.10 −3.6%

To understand how Chora was able to achieve such significant improvements, we examined the routes provided by each solver. Two major differences stand out. For the northern section of trips, Chora was able to consolidate two of the major long-distance trips into a single trip. For the south-eastern trips, Chora managed to consolidate three of the major long-distance trips into two trips.

Two route maps of the Western Cape side by side: Solo's plan covering 7,137 km and Chora's plan covering 6,606 km, with Chora consolidating long-distance trips
Solo (7,137 km, left) versus Chora (6,606 km, right). Chora consolidates the long-distance northern and south-eastern trips.

Decreasing distance by 7.4% and saving a vehicle was an unexpectedly large improvement for such a simple scenario.

Scenario 2: Scenario 1 constraints plus planning of high-priority jobs over low-priority jobs

The second scenario includes the constraints from Scenario 1 but adds the prioritization of high-priority jobs over low-priority jobs while respecting working-hours constraints. The idea is to simulate an environment where there are not enough vehicles to deliver all jobs, while maintaining a rolling set of jobs on the floor and prioritizing those reaching the end of their delivery window. This approach is often used to maximize vehicle utilization and reduce the number of trips to distant locations.

In this scenario, the available vehicles were reduced from 34 to 12. The scenario included 150 high-priority jobs and 267 low-priority jobs. Solo managed to plan 128 of the 150 high-priority jobs and 177 of the 417 total jobs in a solve time of 10 minutes. Chora planned all 150 high-priority jobs and 201 of the 417 total jobs in 1 minute. Both solvers used all 12 vehicles available.

Scenario 2 results: priorities with 12 vehicles
SolverRuntimeHigh-priority jobs plannedTotal jobs plannedVehicles used
Solo10 min128/150177/41712
Chora1 min150/150 +17.2%201/417 +11.9%12

Adding priorities is well known to be difficult with traditional solving methods1, so it was no surprise that Solo did not do well with this constraint. The fact that Chora beat Solo by 11% in the total number of jobs planned was an impressive level of improvement.

Scenario 3: Scenario 1 constraints plus fatigue rules and time windows extended over two days

The third scenario includes the constraints from Scenario 1 but extends the delivery windows over a two-day period and includes European Union (EU) driver-fatigue rules (similar to US fatigue rules). A midday break of 30 minutes must be taken after 4.5 hours of working. In addition, an overnight break of 11 hours must be taken after 13 total hours of working or 9 hours of driving.

Solo managed to plan 196 of the 417 jobs in a solve time of 60 minutes. Chora planned 416 of the 417 jobs in a solve time of 1 minute.

Scenario 3 results: two-day horizon with EU fatigue rules
SolverRuntimeJobs planned
Solo60 min196/417
Chora1 min416/417 +112%

This is a completely dominant result, highlighting the inability of the Solo solver to adequately handle fatigue breaks.

Gantt chart from Tramm showing ten vehicle schedules across two days with mandatory 30-minute and 11-hour fatigue breaks placed by Chora
Distribution of the fatigue breaks across vehicles in Chora's two-day plan.
The same Gantt chart with the 30-minute and 4.5-hour break blocks highlighted
The 30-minute and 4.5-hour breaks highlighted.

It is also instructive to view Chora's convergence graph to understand how results became optimal over the course of the 60-second solve time:

Chora convergence graph: objective cost falls 18% by 10 seconds, 26.4% by 20 seconds and 31.5% by 60 seconds
Chora's convergence graph over a 60-second solve: 417 of 417 jobs planned, 33 trips created.
Objective cost reduction during the 60-second solve
Elapsed timeObjective costReduction
5 seconds3,635,714—
10 seconds2,967,346−18%
20 seconds2,676,530−26.4%
60 seconds2,491,795−31.5%

Scenario 4: Scenario 1 constraints plus loading bays

The fourth scenario includes the constraints from Scenario 1 but adds a single loading dock with only 8 loading bays at the depot. These loading bays are set up to allow reservation slots in 15-minute units. There are not enough loading bays to load all vehicles at once, so loading must be staggered in such a way as to minimize the total waiting time of the vehicles.

Solo did not manage to find a solution after a 60-minute runtime. Chora found a solution in 1 minute and planned 383 of the 451 jobs while achieving 95.3% loading-dock utilization and 100% loading-slot utilization. Some jobs could not be planned because they could not all be loaded, given the individual loading durations combined with the limited number of bays, despite the 12-hour loading window that was available (18:00–06:00).

Scenario 4 results: single dock, 8 loading bays, 15-minute slots
SolverRuntimeSolution foundJobs plannedLoading dock utilisationLoading slot utilisation
Solo60 minNo———
Chora1 minYes383/45195.3%100%
Timeline chart of 27 vehicles from 17:00 to 08:00 showing loading, waiting, driving and delivery phases, with only 8 vehicles loading at any one time
27 vehicles where only 8 can be loaded at a time. Trips that start with long driving legs are loaded first, which minimizes total waiting time.
Timeline chart of the 8 loading bays showing staggered 15-minute reservation slots through the night
The 8 loading bays: only 8 trips may be loaded at a time.

Real-world validation: leading U.S. manufacturer study

JBF Consulting conducted a benchmarking study of Chora for a leading U.S. manufacturer. The study compared Chora's GPU-based solver to vendor solvers from two leading providers under realistic operational conditions including multi-day routing, capacity, regional constraints, and fatigue rules. The objective was to solve for optimal trip distance (as opposed to trip duration) while maintaining optimal vehicle utilization.

845
Jobs (465 collections, 380 deliveries)
478
Unique sites
4
Operating regions, no cross-region routes

Regions

The data defined four distinct operating regions, and the solver was required to respect these boundaries, meaning no route was allowed to cross into another region: NY (Upstate New York), DE (Delaware & Maryland), VA (Virginia) and PA (Pennsylvania).

Fatigue rules

  • Working break: between any two 14-hour work windows (driving + labor), a 10-hour break must occur. A driver may drive a maximum of 11 hours within that 14-hour window, after which the break is required regardless of total labor time.
  • Driving break: after a maximum of 8 consecutive hours of driving, a 30-minute break is mandatory.

Vendor data differences

The key difference between Vendor-A and Vendor-B was the planning horizon. Vendor-A operated over 3 days, with vehicles required to return to the depot by 19:30 on Day 3 (a soft constraint; some trips returned slightly later). Vendor-B operated over 4 days, with the same soft 19:30 return time applied to Day 4.

Vehicle cap

No maximum fleet size was provided. To ensure feasibility, 30 vehicles were supplied for Chora to utilize during the solve.

Key indicative results

Vendor-A vs. Chora (3-day horizon)
SolverRuntimeJobs plannedTotal trip durationTotal trip distanceVehicles used
Vendor-A~2 hours845/8451,237 hr 42 min18,239.10 miles27
Chora1 min −99.1%845/845 0%1,154 hr 22 min −6.7%15,622.63 miles −14.4%26 −3.7%
Vendor-B vs. Chora (4-day horizon)
SolverRuntimeJobs plannedTotal trip durationTotal trip distanceVehicles used
Vendor-B18 min845/8451,204 hr 01 min16,373.98 miles24
Chora1 min −94.4%845/845 0%1,280 hr 19 min +6.1%15,219.51 miles −7.1%23 −4.2%

The vendors were using CPU-based optimizers and, like any vehicle routing solver, they were subject to the exponential complexity inherent in the Capacitated Vehicle Routing Problem (CVRP)2. As the number of jobs and sites increases, the complexity grows exponentially. This problem set contained 478 unique sites and 845 jobs (465 collections and 380 deliveries), with the requirement that collections and deliveries at the same site could not be separated. All loading also had to be completed within the first two days of the window; fatigue rules needed to be applied and respected, and strict regional constraints were enforced. A problem of this size, combined with these operational constraints, represents a significant challenge for any CPU-based solver.

Vendor-A struggled the most, taking 2 hours to produce its solution. Vendor-B achieved a stronger result, with the extra planning day making the problem easier to solve, but still required 18 minutes to complete. Chora, benefiting from massive parallel execution on the GPU, produced an even better solution than both Vendor-A and Vendor-B in a fraction of the time, representing a 99.2% speed-up over Vendor-A and a 94.4% speed-up over Vendor-B. Importantly, Chora ran on only one sixth of a GPU for these tests; using a full GPU would improve run-time by up to an additional factor of 6.

Gantt chart of Chora's routes over four days with travel time, delivery and collection jobs, waiting time and mandatory 10-hour breaks marked
Chora's routes over a four-day period, including sleep-outs and breaks for fatigue-rule adherence.

"GPU-accelerated optimization represents the next frontier in transport planning efficiency."

CTO, Opsi Systems

The screenshot below from Tramm illustrates how Chora achieved extremely high vehicle utilization across the board:

Tramm trips table with the vehicle utilization column highlighted, showing values between 97.9% and 99.8% across 23 trips
Vehicle utilization across the 23 trips in Chora's plan: 97.9% to 99.8%.

"Not only did we see the quality and cost benefits of GPU-based solvers like Chora, the dramatic reduction in solve time marks a paradigm shift in logistics optimization."

Principal, JBF Consulting

Implications for the logistics industry

Chora's success signals a structural change in how optimization can be performed. The enormous computing power in GPUs allows for consistent performance even in large datasets with highly complex multi-constraint environments. This technology empowers planners to re-optimize in near real-time, improving fleet utilization, reducing emissions, and enabling dynamic responsiveness to operational variability.

Future vision

Chora demonstrates how AI and GPU acceleration can fundamentally redefine logistics optimization. Opsi Systems is expanding the framework to include traffic and weather constraints, continuous real-time optimization, and predictive analytics for end-to-end supply chain efficiency.

1 Doan, T. T., Bostel, N., & Hà, M. H. (2021). The vehicle routing problem with relaxed priority rules (VRP-RPR). EURO Journal on Transportation and Logistics, 10, Article 100039. https://doi.org/10.1016/j.ejtl.2021.100039

2 Chen, Y. (2023). Approximation Schemes for Capacity Vehicle Routing Problems: A Survey. arXiv. https://doi.org/10.48550/arXiv.2306.01826

The authors

Chris Doersen

Principal, Client Engagement · JBF Consulting

JBF Consulting is a logistics strategy advisory and technology integration firm that partners with shippers to transform their logistics and supply chain execution operations: strategy development, roadmap orchestration, unbiased technology selection, expert implementation, data-driven insights, and ongoing managed services, for over two decades.

jbf-consulting.com · Chris.doersen@jbf-consulting.com

Dan Palay

Director of Sales & Marketing · Opsi Systems

Opsi Systems is a global provider of advanced transportation management and optimization solutions. Its flagship platform, Tramm, combines planning, execution, real-time visibility, and analytics in a single integrated environment, powered by Chora, Opsi's proprietary GPU-accelerated optimization engine. Opsi serves leading retailers, manufacturers, logistics providers, and transporters across owned and contracted transport networks.

tramm.global · Dan.palay@opsi.co.za

Frequently asked questions

GPU route optimization: what the benchmarks show

How much faster is a GPU route optimisation solver than a CPU solver?

In the benchmarks in this paper, Chora solved every scenario in about one minute. The CPU-based solvers took 10 to 60 minutes on the same internal dataset and 18 minutes to roughly 2 hours on an 845-job U.S. manufacturer network, a 90% to 99% reduction in solve time.

Does GPU optimisation improve route quality, or only speed?

Both. In the single-day scenario Chora cut total distance by 7.4%, trip duration by 6.1% and cost by 3.6% while using one fewer vehicle. Against two commercial solvers it reduced distance by 14.4% and 7.1% and used one fewer vehicle in each case.

Which solver was benchmarked in this white paper?

Chora, the GPU-powered vehicle routing solver inside Tramm TMS, developed by Opsi Systems. It is built on NVIDIA's CUDA framework and uses thousands of GPU threads with genetic algorithms to search solution spaces faster and more thoroughly than CPU solvers.

How was Chora benchmarked?

Two ways. Opsi Systems ran four scenarios on one dataset (1 depot, 34 vehicles, 417 jobs) against its previous CPU solver, Solo. Separately, JBF Consulting benchmarked Chora against two leading commercial solvers on a real U.S. manufacturer's four-region, multi-day, fatigue-constrained network of 845 jobs.

How do route optimisation solvers handle driver fatigue rules and loading bay constraints?

Fatigue regulations and finite dock capacity are hard constraints, which means a solver must satisfy them rather than treat them as preferences — and they are where many solvers fail outright rather than returning a worse answer. The benchmarks here show the difference: under EU fatigue rules over a two-day horizon Chora planned 416 of 417 jobs in one minute, where the CPU solver planned 196 in an hour. With a single dock of 8 loading bays the CPU solver found no solution at all in 60 minutes; Chora found one in a minute, at 95.3% dock utilisation.

Is the white paper independent?

It is co-authored by JBF Consulting, an independent logistics strategy and technology-selection advisory, and Opsi Systems, the developer of Chora. The U.S. manufacturer study was conducted by JBF Consulting; the four-scenario internal study was conducted by Opsi Systems.

Free sample run

Have a hard routing problem? We'll run it through Chora at no cost.

JBF Consulting and Opsi Systems invite logistics software vendors, 3PLs and supply chain operators with difficult optimization problems to send us a dataset. We will perform a sample optimization run and share the results.*

Request a sample run
*Contact us for terms and conditions.
Download

Get the white paper as a PDF

Twenty pages, including every benchmark table, route map and Gantt chart in this study. Leave your email and we will send the PDF and keep you posted on Chora developments.

Prefer to skip the form? Open the PDF directly (4 MB).
Tramm logo

Manage Your Logistics with Precision

Get on the path to better performance with Tramm.

Blue shipping container on an articulated truck trailer travelling an open road at sunset.